Today, January 31st, he was ready to cut a hole in our roof over the bathroom shower stall "we're" remodeling. (I like that "we're." My role consists of bringing beer from the kitchen or store and rubbing the cream on his shoulders. But, as they say, "it's a job.")
Above left is a picture of the shower in its beginning state of d
After the Mister was through tearing out the closet we decided to sacrifice for more shower space, putting in the plumbing and building a wall between the two bathrooms, Greg the Tile Master got to work.
He laid down Wonderboard on the floor and put visquine down and around on the walls. Then he put up cement board on the walls that he adheres the
That was when the Mister cut a hole in the roof, and Ricardo, the roof guy, came and roofed around the frame for the skylight. Brr! It was in the 30s outside, but blue sky.

Now, this evening, the hole in the roof is blocked up and everything is nice and warm. The skylight window hadn't come in, but we needed to take advantage of Ricardo's schedule and the clear weather.
Tomorrow Greg will lay actual tile, I think. Today he also finished the basic form of the shower bench that will allow us to sleep a little longer in the mornings while warm water runs over us. Ahh! Makes all those trips to the store for beer almost worth it.
Don't think I didn't do something artistic today. I got myself an Obamacon and designed a postcard for our nonprofit art group. I'll show myself to you with my word for this year: Confident. - femminismo